地震地质 ›› 2003, Vol. 25 ›› Issue (4): 555-565.

• 研究论文 • 上一篇    下一篇

色尔腾山山前断裂得令山以东段晚第四纪活动特征与古地震事件

陈立春1, 冉勇康1, 常增沛2   

  1. 1. 中国地震局地质研究所, 北京, 100029;
    2. 山东正元地理信息工程有限责任公司, 淄博, 255200
  • 收稿日期:2002-10-07 修回日期:2003-03-30 出版日期:2003-12-03 发布日期:2009-10-26
  • 作者简介:陈立春,男,1970年出生,1991年毕业于中国地质大学(武汉)矿床地质学专业,2002年在中国地震局地质研究所获硕士学位,助理研究员,主要研究方向为活动构造与古地震,电话:010-62009037,E-mail:dzsclc@21cn.com.
  • 基金资助:
    国家重点基础研究发展规划项目(G19980407)资助.中国地震局地质研究所论著2003B0039.

CHARACTERISTICS OF LATE QUATERNARY FAULTING AND PALEOSEISMIC EVENTS ON THE EAST OF DELINGSHAN SEGMENT OF THE SERTENGSHAN PIEDMONT FAULT

CHEN Li-chun1, RAN Yong-kang1, CHANG Zeng-pei2   

  1. 1. Institute of geology, China Seismological Bureau, Beijing 100029, China;
    2. Zhengyuan geographic information engineering limited Co., Zibo 255200, China
  • Received:2002-10-07 Revised:2003-03-30 Online:2003-12-03 Published:2009-10-26

摘要: 色尔腾山山前断裂得令山以东段属全新世活动断裂。距今约30ka以来,断裂上升盘的平均抬升速率为:大佘太段0.19mm/a,乌兰忽洞段0.20mm/a。探槽揭露,大佘太段,约32kaBP以来,发生过4次古地震事件,事件发生时间依次为(31 690±1 770),(23 000±1 320),(15 420±870),(7 440±440)aBP,相应的位移量分别为2.6,1.6,2.2,1.4m;乌兰忽洞段,约25kaBP以来,也发生过4次古地震事件,事件发生时间依次为(25 130±1 430),(14 570±820),(11 660±650),(7 220±400)aBP,相应的位移量分别为2.6,1.8,1.3,1.2m。根据位移量限定法,两个活动段落的古地震活动历史是完整的。

关键词: 古地震, 活动断裂, 色尔腾山山前断裂

Abstract: The Sertengshan piedmont fault is a very important active fault. Along with the Langshan piedmont fault, it controls the northwest boundary of the Hetao fault-depression zone. We have carried out detailed investigation of fault activity and paleoseismology on east of Delingshan segment of this fault, on which little work has been done before. The result of investigation indicates that the geomorphic characteristics of late Quaternary activity on this segment of the Sertengshan piedmont fault are very remarkable, appearing as the offset and uplift of lacustrine deposits, alluvial fan and stream terraces, resulting in linear scarps and fault platforms. Taken the Xiaoshetai canal outlet as boundary, this fault segment can be subdivided into the Dashetai and Wulanhudong active fault segments characterized by different features. In the past 30ka BP,the average uplift rate of the upthrown side on the Dashetai segment is 0.19mm/a, while that of the upthrown side on the Wulanhudong segment is 0.20mm/a. One trench has been excavated on each active fault segment for paleoseismic investigation. As a result, the Hongming trench on the Dashetai segment has revealed that 4 paleoseismic events have occurred on this segment since about 32ka BP, the occurrence times of which are successively 31,690?1770, 23,000?1320, 15,420?870 and 7,440?440a BP. The corresponding displacements produced by these 4 events are 2.6, 1.6, 2.2 and 1.4m, respectively. The Wulanhudong trench on the Wulanhudong segment, has also revealed that 4 paleoseismic events have occurred on this segment since about 25ka BP, the occurrence times of which are successively 25,130?1430, 14,570?820, 11,660?650 and 7,220?400a BP. The corresponding displacements produced by these 4 events are 2.6, 1.8, 1.3, and 1.2m, respectively. The comparison of these paleoseismic events also indicates that the subdivision of east of Delingshan segment of the Sertengshan piedmont fault into 2 active fault subsegments is acceptable. Finally, according to the Displacement amount-constraining Method, it is confirmed that the acquired paleoseismic activity histories for the two segments are complete during the observed period of time.

Key words: paleoseismic event, active fault, Sertengshan piedmont fault

中图分类号: